The building continued to be used as an international
conference centre during the progress of the
works.
The
existing pinnacles required stablising and strengthening with the
insertion of stainless steel dowels which were subsequently
grouted. This work, which was carried out at high level, was
to a very strict tolerance to avoid damage to the remaining
structure. |